Job Search |  Indonesia |  Malaysia |  more.. |  SuperFood

 

Classified  |  Property |  Massage Hub  |  Mitty Meat

 


New Passenger Terminal Building Will Be Up For Construction At Seletar Airport

zoom

pre 1 of 1 next

Location: Others

Date posted 31 May 2016

Price: Please contact

Ad ID: 13604

Reply by email

The new incoming terminal is set up to be finished by final stage of 2018 and the construction for the new PTB is arranged to start out October this year after the tender for the construction was published last May 18. As shortly as the new PTB is up and running, the ongoing operations at passenger terminal on Seletar Airport western side will terminate. A brand-new Passenger Terminal Building (PTB) will be up for construction at Seletar Airport, Civil Authority (CAAS) as declared on May 19. This is to conciliate the gain in air traffic and maximise efficiency in air travel functions. The project is likewise part of attempts to relieve pressure sensation on the constantly tied up Changi Airport.

 

For additional information on the Rising Projects, visit Singapore Property.

  • Share this ad: pictute pictute pictute pictute
  • Print: pictute
  • Add to favorites: pictute
  • Report: pictute